Construction projects overview

Our Work

Projects That Define Our Expertise

From emergency flood response to major infrastructure projects, our portfolio demonstrates our capability to handle any dewatering challenge.

Bridge foundation construction with dewatering systems along the Grand River
Deep Well Dewatering

Grand River Bridge Foundation

📍 Grand Rapids, MI

Major bridge foundation project requiring deep well dewatering to lower groundwater levels 35 feet below grade for pier construction in high water table conditions adjacent to the Grand River.

Water treatment facility expansion with groundwater control systems
Groundwater Control

Detroit Water Treatment Plant Expansion

📍 Detroit, MI

Expansion of a major municipal water treatment facility requiring comprehensive groundwater control for new clarifier basin construction in challenging urban conditions.

Highway construction dewatering for I-96 expansion project in Lansing Michigan
Construction Dewatering

I-96 Highway Expansion — Lansing Corridor

📍 Lansing, MI

MDOT highway expansion project requiring dewatering support for multiple bridge abutments, culvert installations, and below-grade drainage structures along a 12-mile corridor.

Utility corridor dewatering for underground pipe replacement in Ann Arbor
Utility Installation Dewatering

Ann Arbor Utility Corridor Replacement

📍 Ann Arbor, MI

Complete replacement of aging water main and sanitary sewer infrastructure in a dense urban corridor requiring continuous dewatering for 3.2 miles of trench work.

Industrial building foundation dewatering in Muskegon Michigan
Foundation Dewatering

Muskegon Industrial Complex — New Construction

📍 Muskegon, MI

New 250,000 SF industrial facility requiring foundation dewatering for deep basement construction in sandy soils with a groundwater table only 6 feet below grade.

Municipal pump station construction with dewatering support in Kalamazoo
Pump Installation

Kalamazoo Regional Pump Station

📍 Kalamazoo, MI

New municipal pump station construction requiring deep excavation dewatering and permanent pump installation for a critical regional wastewater infrastructure project.

Emergency dewatering response for Chicago transit tunnel flooding
Emergency Dewatering

Chicago Transit Authority Tunnel Repair

📍 Chicago, IL

Emergency response to unexpected flooding in an active transit tunnel requiring immediate dewatering to restore service and prevent structural damage to critical infrastructure.

Wellpoint dewatering system for sewer main installation in Toledo Ohio
Wellpoint Systems

Toledo Sewer Main Extension

📍 Toledo, OH

New 2.8-mile sanitary sewer main installation in high water table conditions requiring continuous wellpoint dewatering to maintain dry trench conditions throughout installation.

Municipal water main replacement with water management systems in South Bend Indiana
Water Management

South Bend Municipal Water Main Replacement

📍 South Bend, IN

Complete replacement of aging 36-inch water transmission main requiring comprehensive water management including dewatering, discharge management, and temporary water supply.

Harbor dock construction with excavation dewatering in Milwaukee Wisconsin
Excavation Dewatering

Milwaukee Harbor Expansion — Dock Construction

📍 Milwaukee, WI

Major harbor expansion project requiring deep excavation dewatering for new dock construction in challenging waterfront conditions with high groundwater and tidal influence.

Resort development environmental water management near Traverse City Michigan
Environmental Water Management

Traverse City Resort Development

📍 Traverse City, MI

Luxury resort development adjacent to sensitive wetlands requiring environmentally responsible dewatering with strict discharge management and ecosystem protection measures.

Road reconstruction project with construction site water control in Ottawa County Michigan
Construction Site Water Control

Ottawa County Road Reconstruction

📍 Ottawa County, MI

Major county road reconstruction project requiring integrated construction site water control for 8.5 miles of road reconstruction including drainage improvements and culvert replacements.

Ready to Add Your Project to Our Portfolio?

Contact our team to discuss your dewatering needs and get a competitive quote.