
Our Work
Projects That Define Our Expertise
From emergency flood response to major infrastructure projects, our portfolio demonstrates our capability to handle any dewatering challenge.

Grand River Bridge Foundation
📍 Grand Rapids, MI
Major bridge foundation project requiring deep well dewatering to lower groundwater levels 35 feet below grade for pier construction in high water table conditions adjacent to the Grand River.

Detroit Water Treatment Plant Expansion
📍 Detroit, MI
Expansion of a major municipal water treatment facility requiring comprehensive groundwater control for new clarifier basin construction in challenging urban conditions.

I-96 Highway Expansion — Lansing Corridor
📍 Lansing, MI
MDOT highway expansion project requiring dewatering support for multiple bridge abutments, culvert installations, and below-grade drainage structures along a 12-mile corridor.

Ann Arbor Utility Corridor Replacement
📍 Ann Arbor, MI
Complete replacement of aging water main and sanitary sewer infrastructure in a dense urban corridor requiring continuous dewatering for 3.2 miles of trench work.

Muskegon Industrial Complex — New Construction
📍 Muskegon, MI
New 250,000 SF industrial facility requiring foundation dewatering for deep basement construction in sandy soils with a groundwater table only 6 feet below grade.

Kalamazoo Regional Pump Station
📍 Kalamazoo, MI
New municipal pump station construction requiring deep excavation dewatering and permanent pump installation for a critical regional wastewater infrastructure project.

Chicago Transit Authority Tunnel Repair
📍 Chicago, IL
Emergency response to unexpected flooding in an active transit tunnel requiring immediate dewatering to restore service and prevent structural damage to critical infrastructure.

Toledo Sewer Main Extension
📍 Toledo, OH
New 2.8-mile sanitary sewer main installation in high water table conditions requiring continuous wellpoint dewatering to maintain dry trench conditions throughout installation.

South Bend Municipal Water Main Replacement
📍 South Bend, IN
Complete replacement of aging 36-inch water transmission main requiring comprehensive water management including dewatering, discharge management, and temporary water supply.

Milwaukee Harbor Expansion — Dock Construction
📍 Milwaukee, WI
Major harbor expansion project requiring deep excavation dewatering for new dock construction in challenging waterfront conditions with high groundwater and tidal influence.

Traverse City Resort Development
📍 Traverse City, MI
Luxury resort development adjacent to sensitive wetlands requiring environmentally responsible dewatering with strict discharge management and ecosystem protection measures.

Ottawa County Road Reconstruction
📍 Ottawa County, MI
Major county road reconstruction project requiring integrated construction site water control for 8.5 miles of road reconstruction including drainage improvements and culvert replacements.
Ready to Add Your Project to Our Portfolio?
Contact our team to discuss your dewatering needs and get a competitive quote.